CROWN VILLAS

  • Investor
    Thai Hung Corp
  • Project Location
    Gia Sang, Thai Nguyen
  • Total Area
    35.4 Hec
  • Deployment Status
    master plan, infrastructure concept, basic design, technical - construction design
    (architecture, CS, MEP, landscape)
  • Operating Time
    2017